May 2011
The Heat Stability Test Machine is operative
Metalcam, always oriented towards the technological development and willing to increase its know-how, is proud to announce that its heat stability test machine is now operative. This test will be performed on different types of forgings, mainly rotors for steam turbines.
The new equipment allows all our customers of the Power Generation sector to find in Metalcam a qualified supplier, able to satisfy any needs, both technical and productive, in order to guarantee the high quality standards that have always characterized our company.
One-Stop Shop
Thanks to Metalcam’s long experience and the quality of its modern processing plants, it can provide one single point of contact for the complete manufacturing process. Bonnie Yuill finds out more.
October 2010
The First 40 tons Ingot
Thanks to recent plant investments, Metalcam reached the goal of producing a 40 tons ingot for the production of forging solutions.
This testifies Metalcam continuing effort aimed at widening the range of products available to customers by implementing appropriately every single department of the production cycle.
January 2010
The new 70 tons capacity manipulator is now fully operational
Metalcam is proud to announce the recent installation of a brand new 70 tons capacity manipulator, which has been fully operational since the beginning of 2010.
The manipulator allows the production of a wider range of steel forgings in a variety of shapes and weight up to 40 tons.
The optimization of the forging process to its highest level and the resulting minimization of the final product’s costs is ensured by a process of increased flexibility, functionality, maneuverability and efficiency.